Ipswich Station main level is done. Lots of M track distance for diesel and steam locs running, as well as some staging segments. Undertable wiring is biggest job, with 50+ vintage switches and signals controlled by 13 k83s, and ~40 feedback rails using L88 and S88. Hanging underworld boxes will eventually be mounted, and wires shortened and guided. Only screwed track to base in a few places to minimize M track noise amplification. Roundtable and crane returned to analog control, as they are mostly cosmetic for now. Bridge is removable.
Test (in Rocrail) shows that everything works after replacing a few malfunctioning switches and troubled track.